A new owner took over a golf course and wanted to save the old structures while making them look nice and functional to last. We did the grade work around the building and the concrete/asphalt. The interior got three levels with three entries and separate functions for the bays. The framing was done, ventilation added and the metal R Panel siding installed. The roof was redone and cabinets built for the interior.